City of Box Elder
The City of Box Elder has been growing substantially for the past few years, with the need of additional office space the City purchased a building in need of repairs. C. Eagle Construction was the selected Design-Build contractor for design and construction. With the help of Design-Arc Group, Albertson Engineering, Towey Design Group, and Malone […]
Dakota Economic Development Corporation
The Dakota Economic Development Corporation (DEDC) was a design/build project in which C. Eagle Construction delivered a 5,000 Square Foot turn-key facility to the Crow Creek Tribe. The wood framed construction with metal siding and roof was completed in 10 months.
Wessington Springs Rec Center
The Wessington Springs Recreational Center provides the community with a new basketball/volleyball gymnasium, concession stand, locker rooms, weight lifting room, restrooms and storage area. This project was for the City of Wessington Springs and is attached to the existing Elementary School. C. Eagle Construction constructed the 15,000 Square Foot Pre-Engineered Building within 17 months. The […]
Ft. Thompson Child Care
The Ft. Thompson Child Care Facility was a design/build project to enhance the care of the Children of the Crow Creek Tribe. C. Eagle Construction constructed this 4,500 Square Foot, two story, precast core floor, wood framed, metal siding and roof facility within 12 months. Some of the special features of this project included a […]
Woonsocket Garage Addition
C. Eagle Construction poured the foundation, garage addition and driveway at this residence in Woonsocket. Our crews are built with knowledge and experience from the industry, and will take on any job no matter how large or small.
Vivian Rest Stop
This project consists of replacing existing shake shingles with a Metal Roof Panels. Increasing the thermal insulation value by adding rigid insulation on the roof and interior of the building walls. Work also includes modernization for ADA compliance, Upgrading MEP fixtures, adding a vestibule, a family restroom, and new finishes. The existing site Hardscape was […]
Belvidere Rest Stop
This project consisted of replacing existing shake shingles with a Metal Roof Panels. Increasing the thermal insulation value by adding rigid insulation on the roof and interior of the building walls. Work also included modernization for ADA compliance, Upgrading MEP fixtures, adding a vestibule, a family restroom, and new finishes. The existing site Hardscape was […]
Presho Library
This project consisted of remodeling existing 1,900sf building for the Presho Public Library and New 1,500sf addition for City of Presho City Hall for a total of 3,400sf usable space. Work also included new standing seam metal roof, mechanical, and electrical services.
Wildlife Building
This project was negotiated with the Crow Creek Sioux Tribe-The Wildlife Building started out under another contractor but was then Sub-Contracted to C. Eagle Construction to finish. This project is a 4,000SF new building 16’ in height that has 1,400SF of office space and 2,600SF of new shop space. The project was completed on time […]
Wilhelmi Detached Garage
The Wilhelmi Residence was in need of additional space to host their camper. We were contacted by the Wilhelmi’s to build this structure back in 2020 and we were happy to do so! This oversized garage was completely self-performed by C.Eagle’s crews alongside the owner running the electrical. Rest assured, big or small projects our […]