MRUC Phase 2
C Eagle Construction had the opportunity to work with Under Canvas at their Mount Rushmore facility in winter of 23/24 to help modernize their kitchen and laundry facilites, as well as various site/deck improvements throughout the property. C Eagle Crews fought cold weather and muddy conditions to get the drilled pier foundations poured to meet […]
Crow Creek Treatment Center
C. Eagle Construction has designed and is constructing a 5,000 SF single story facility for the Crow Creek Tribe, just North of Ft. Thompson on the banks of Lake Sharpe. This facility has 10 bedrooms, office space, conference room, reception area, library, commercial kitchen, dining area and restrooms. The facility is a wood framed, slab […]
Woonsocket School
The Woonsocket School CTE Addition is an 8,500 SF, two story addition to advance the students in Career and Technical Education. The CTE addition will provide opportunities in welding, auto mechanics and wood working. There will also be additional classrooms and locker facilities. This school addition is a wood framed, metal sided building constructed on […]
West Brule Grocery Store
The West Brule Grocery Store will serve the West Brule and Lower Brule communities. This facility is a 14,000 SF Pre-Engineered Metal Building constructed on a spread footing foundation from Behlen Manufacturing. The grocery store will have a meat room, produce section, walk-in coolers and freezers, kitchen facility and community outreach office. We anticipate completion of […]
Rose Hill
This slab on grade, wood framed, brick exterior and metal roof building is being built for the Western Area Power Administration just south of Wessington. C. Eagle Construction will complete this 1,800 Square Foot building by Mid-Summer 2024.
Sinte Gleska
This pre-existing Tepee Structure experienced major drainage and water damage prior to C. Eagle Construction making repairs. C. Eagle Construction regarded the surrounding areas and diverted the drainage away from the building. The building was also experiencing water damage from a leaking roof and siding. C. Eagle Construction removed an observation dome and infilled it […]
Takota Youth Center
This project was an addition to the newly constructed Takota Youth Center. C. Eagle Construction added a new patio area with stairs and an ADA ramp. We also provided a grass area for kids to play soccer, flag football and lacrosse and a walking path.
City of Box Elder
The City of Box Elder has been growing substantially for the past few years, with the need of additional office space the City purchased a building in need of repairs. C. Eagle Construction was the selected Design-Build contractor for design and construction. With the help of Design-Arc Group, Albertson Engineering, Towey Design Group, and Malone […]
Dakota Economic Development Corporation
The Dakota Economic Development Corporation (DEDC) was a design/build project in which C. Eagle Construction delivered a 5,000 Square Foot turn-key facility to the Crow Creek Tribe. The wood framed construction with metal siding and roof was completed in 10 months.
Wessington Springs Rec Center
The Wessington Springs Recreational Center provides the community with a new basketball/volleyball gymnasium, concession stand, locker rooms, weight lifting room, restrooms and storage area. This project was for the City of Wessington Springs and is attached to the existing Elementary School. C. Eagle Construction constructed the 15,000 Square Foot Pre-Engineered Building within 17 months. The […]